NOTE: The following pages were created from material furnished by Air Plains Services.

ACCESSORY ITEMS NOT INCLUDED WITH YOUR AIR PLAINS 180 CONVERTION:

  1. muffler
  2. vacuum pump
  3. THE END

These items are not replaced based on the "if it's not broke, don't fix it" theory. Nine times out of ten, the muffler and vacuum pump on your existing engine are in excellent shape, or have recently been replaced before coming to Air Plains.

The information on the following pages outlines our kit contents and pricing. Please call us at 1-800-752-8481 with any comments or questions you might have. We'll look forward to hearing from you.


Typical Air Plains 180 FACTORY INSTALLATION
(Air Plains Work Order for installing your APS 180)

  1. Perform Air Plains "Pre-disassembly" inspection. in accordance with APS Checklist.
    Step 1 of our conversion involves a quick, initial test flight. It allows us the opportunity to record the performance of the old engine and any notable discrepancies. These items are, of course, discussed with the owner prior to the start of any work. We also inventory and check over your aircraft prior to starting any work.... to ensure a timely delivery upon completion.
  2. Install AIR PLAINS 180 horse engine in accordance with APS STC No. 5A4428SW.
    Step two involves the actual commencement of engine conversion, and becomes more detailed in the following steps.
  3. Perform Air Plains disassembly inspection.
    As your engine comes apart and off of the aircraft, we begin our inspection of your engine baffles, carb heat induction airbox, exhaust stacks, cowl shock mounts, fasteners, and all related removed components. ANY DISCREPANCIES FOUND on your baffles, airbox, and exhaust stacks, etc. (Re-used from your airframe) will be discussed for needed repair. We prefer to improve these components to "like new" condition, prior to modifying them to fit the new engine.
  4. Install AIR PLAINS 2500-2550 Gross Weight Increase Kit.
    Normally 2-3 hours, this step involves the limitation of flap travel to thirty degrees, and the installation of a new airspeed indicator ON 172K-P MODELS ONLY.
  5. Inspect aircraft for 6 ply tires.
    6 ply tires are required as a part of the 2500-2550 Gross Weight Increase AVAILABLE ON 1969 AND NEWER AIRPLANES. If you need a tire or two, we will let you know,
  6. Perform static system leak test BEFORE and AFTER installing new airspeed indicator. Record leak rates, report any leak rates in excess of 100 feet per minute in accordance with FAR 91.411 paragraph A(2).
    During the installation of your new air-speed indicator, your static system will be leak checked in accordance with the FAR's. Any leak rates in excess of the required limits will he repaired with your permission.
  7. Perform flight test of new engine in accordance with APS checklist and Lycoming recommended break in procedures.
    This involves several steps and inspections, and in the end, your aircraft engine will be test flown for approximately 3-4 hours, inspected several times, and then re-inspected once more for final delivery. NOTE: APS personnel will take special time to instruct you on the performance and break in procedures for your new Lycoming engine, before delivery.
  8. Weigh aircraft with electronic scales upon completion of all maintenance and modifications.
    Chances are that this will be the first time your aircraft has been weighed since it came from the factory. Our scales are re-calibrated on a regular-basis, to guarantee exact weight, balance, and C.G. computations.
  9. Perform Pre-delivery, inspection in accordance with APS checklist.
    This is our final check OF EVERYTHING WE HAVE TOUCHED, and we check it ONE MORE TIME, before delivery.
  10. Clean aircraft interior and exterior for delivery.
    Air Plains NEVER delivers a dirty airplane.
  11. Install AIR PLAINS 180 logo decals to empennage aircraft.
    Upon customer approval, we install our "180" logo.
  12. SHEET METAL REPAIRS:
    Advise of any repairs needed to refurbish engine baffles airbox exhaust stacks etc to "like new" condition. Please itemize for customer notification and approval.

    Required or excessive repairs are completed on a quote and bid basis. Our sheet metal personnel can usually refurbish an entire set of baffles to new condition for less than the cost of buying one new baffle from the Cessna factory. NOTE: the engine components listed should not need any repair work, due to the fact that you are flying under a current annual inspection.
    After refurbishment, the sheet metal components to be installed on the engine are completely cleaned, treated, primed, painted, and reinstalled with new 1/8th inch thick red silicone baffle seal.
  13. Reserved for ANNUAL inspection.
    Offered at reduced rates when engine conversion is performed.

The above listed installation steps take an average of 46 man hours to complete. Our turn around times, starting at the beginning of the week, allow delivery of your aircraft on Wednesday evening or Thursday morning of the same week. (3-4 days!) APS averages the conversion of more than two airplanes per week!

Should you choose our ship out kit, the average installation times at shops around the country range from 60-65 hours (for the first time installer).

We have taken the time to list these items for you, because we want you to note that each and every item needed for your engine conversion has been thoroughly considered. Whether installed here at our facilities or shipped to your local shop for installation your Air Plains engine conversion will be delivered as an all-encompassing kit. Our standardized kit, installation instructions, blueprints, and continued airworthiness manual safeguard the procedures and standards for installation and maintenance of your new conversion....no matter where you choose to have your conversion installed!

Referrals are available! As your interest in our conversion continues to increase, we can put you in touch with other AIr Plains 180 conversion owners. We will also be happy to discuss any questions or comments that you might have regarding our conversion. Please give us a call if we can answer any questions or be of service.


The Back to the Main Page Goto Button Return To Main Menu

You have been visiting: http://www.sensenich.com